iDSLab · Factory game

Masterplanner — OMG Corporation flagship factory

You are the Masterplanner of the OMG Corporation's flagship factory. Your task: meet the customer's demand and keep the operation running at the lowest possible cost.

The boundary conditions — customer orders, machine capacity and more — are set at random for every game. As Masterplanner you can call the factory staff to a planning meeting at any time (the clock stops) and readjust the facility. You have a free hand, within limits — as you will see. Just like a real Masterplanner.

At the end of every game you get a summary of exactly what happened and what to do next time. Good luck!

OMG Corporation is fictional.

  1. 01Purchasing, incoming inspection, store
  2. 02Planning for all steps
  3. 03Production step 1
  4. 04Production step 2
  5. 05Final quality inspection
  6. 06Shipping

How to play

  1. 01Read the customer order: what is needed, and by when (call-offs).
  2. 02Set your knobs before day 1 — starting an empty factory is its own plan.
  3. 03The game starts in a planning meeting, and by default the factory stops for a planning meeting after every day. “Close meeting — run day NN” runs one day at your chosen speed (0.1× or 0.5× to watch closely, 1.0× or 2× to move on). Switch “Daily planning meeting” off to let the clock run.
  4. 04Planning meeting = your planning / production meeting. To make life easier, time stops the moment you start a meeting, so you have time to review the whole situation, re-plan and adjust the knobs. You can call a meeting whenever you wish, for as long as you wish. Changes apply from the next day — and before you close the meeting, always check the planning board's top line for the next customer supply problem.
  5. 05Watch the warning signs: a yellow flashing empty buffer, red breakdowns, a call-off coming up short.
  6. 06Deliver every call-off on time at the lowest cost per delivered unit. If the customer's line stops, the game ends.

Score: on-time share first, then cost per delivered unit — measured against the best setup for your scenario.

Masterplanner ranking

Score = 1000 × on-time share × (ideal cost per delivered unit ÷ your cost per delivered unit), max 1000. Delivered runs rank above stopped runs. Every game is a different scenario, so each run is measured against the best setup for its own scenario.

Game names are made up; no real names, companies or emails. Replays are not ranked.

RankPlayerClientScoreOn timeCost / unit vs idealDate

How to play

The clock is paused while this is open.